by Terry_Zakis » Fri Jul 15, 2005 5:37 am
You should be able to take two of these 110 volt motors, and wire them in series, across a 220 volt line, and cut the amperage in half. Still, when designing my flow bench set up, I figured on 8-motors, and ran a separate 100 amp subfeed to my shop for this. That way I'd still have room left over for other devices. So 10-motors is a bunch!
Terry Terezakis
Western Massachusetts, USA