by SuperRunner » Fri Feb 24, 2006 12:48 pm
Yeah, I was thinking about doing that to seal the backing on, but I also was looking at some other inserts as well a the T nuts, that looked a little stronger. I would have picked them up, but they only had 8 of them, so I need to go to a different store. Anyway, I am going run about 1 1/2" of particle board around the permiter of the inside of each side of the cabinet, and then re-inforce with blocks of 2x4 behind that with the inserts. Then add a piece of weather stripping. That way I could make the back removable.
I do like that idea of adding a threaded rod with an adjustment sleeve in the middle. Although, for the vacuum side, the threaded rod is a little flimsly, and might need to go with a larger diameter rod.
For my motor support, I chose to go with a mix of plywood and particle board. After seeing what happend to cboggs, it had me a little worried. Now it will NOT BREAK!!
I hope to have it all assembled by this weekend, and then let it dry and hopefully turn it on early next week.
Turbocharge EVERYTHING...that is how I see it.